{"id":3341,"date":"2018-07-12T08:31:48","date_gmt":"2018-07-12T08:31:48","guid":{"rendered":"http:\/\/gitco-int.com\/new\/?page_id=3341"},"modified":"2018-07-18T07:00:24","modified_gmt":"2018-07-18T07:00:24","slug":"location-preparation","status":"publish","type":"page","link":"https:\/\/gitco-int.com\/new\/location-preparation\/","title":{"rendered":"LOCATION PREPARATION"},"content":{"rendered":"<div class=\"wpb-content-wrapper\"><p>[vc_row fluid=&#8221;1&#8243; full_content=&#8221;1&#8243; row_padd=&#8221;no-padding&#8221;][vc_column][vc_column_text]<\/p>\n<h3><strong>RIG LOCATION AND SITE PREPARATION FOR WORK OVER AND PULLING UNITS<\/strong><\/h3>\n<p><img data-recalc-dims=\"1\" decoding=\"async\" loading=\"lazy\" class=\" wp-image-3344 alignright\" src=\"https:\/\/i0.wp.com\/gitco-int.com\/new\/wp-content\/uploads\/2018\/07\/1-4.jpg?resize=269%2C202\" alt=\"\" width=\"269\" height=\"202\" srcset=\"https:\/\/i0.wp.com\/gitco-int.com\/new\/wp-content\/uploads\/2018\/07\/1-4.jpg?resize=300%2C225&amp;ssl=1 300w, https:\/\/i0.wp.com\/gitco-int.com\/new\/wp-content\/uploads\/2018\/07\/1-4.jpg?w=332&amp;ssl=1 332w\" sizes=\"auto, (max-width: 269px) 100vw, 269px\" \/><\/p>\n<p><strong>Gitco International<\/strong> is approved as Subcontractor with KOC for Location Services. The Project involves preparing the Rig Location and the Site for Workover and Pulling Units.<\/p>\n<p><strong>OUR VARIOUS SERVICES ARE:<\/strong><\/p>\n<ul>\n<li>Location leveling, grading and compaction using heavy machinery<\/li>\n<li>Excavation of sewage and Flare pit<\/li>\n<li>Cellar cleaning<\/li>\n<li>Backfilling and levelling the waste pit after operation<\/li>\n<li>Supply and install temporary fence around well head &amp; waste pit<\/li>\n<li>Leveling and grading of location access road (200ft)<\/li>\n<li>Construction and installation of RCC 8\u2019- 0\u201d (diameter) * 5\u2019 -6 \u201c<a href=\"https:\/\/i0.wp.com\/gitco-int.com\/new\/wp-content\/uploads\/2018\/07\/2-6.jpg\"><img data-recalc-dims=\"1\" decoding=\"async\" loading=\"lazy\" class=\" wp-image-3345 alignright\" src=\"https:\/\/i0.wp.com\/gitco-int.com\/new\/wp-content\/uploads\/2018\/07\/2-6.jpg?resize=258%2C220\" alt=\"\" width=\"258\" height=\"220\" \/><\/a><\/li>\n<li>(Clear inside depth)<\/li>\n<li>Mechanical Excavation and backfilling for cellar construction<\/li>\n<li>Barricading (8 m*8 m*80 cm) around well head with portable concrete blocks, Standard Jersey Barriers)<\/li>\n<li>The earth works are included the below:<\/li>\n<li>Cleaning and removing the top layer of loose sand<\/li>\n<li>Supply of suitable backfilling material<\/li>\n<li>Area compaction using heavy machinery<\/li>\n<li>Installing conductor pipe<\/li>\n<\/ul>\n<p>[\/vc_column_text][\/vc_column][\/vc_row]<\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>[vc_row fluid=&#8221;1&#8243; full_content=&#8221;1&#8243; row_padd=&#8221;no-padding&#8221;][vc_column][vc_column_text] RIG LOCATION AND SITE PREPARATION FOR WORK OVER AND PULLING UNITS Gitco International is approved as Subcontractor with KOC for Location Services. The Project involves preparing the Rig Location and the Site for Workover and Pulling Units. OUR VARIOUS SERVICES ARE: Location leveling, grading and compaction using heavy machinery Excavation of<\/p>\n<div class=\"wst-more-wrap\"><a class=\"more-link\" href=\"https:\/\/gitco-int.com\/new\/location-preparation\/\"><span><\/span><\/a><\/div>\n<p> <a class=\"more-link\" href=\"https:\/\/gitco-int.com\/new\/location-preparation\/\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"nf_dc_page":"","_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"class_list":["post-3341","page","type-page","status-publish","hentry"],"jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/gitco-int.com\/new\/wp-json\/wp\/v2\/pages\/3341","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/gitco-int.com\/new\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/gitco-int.com\/new\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/gitco-int.com\/new\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/gitco-int.com\/new\/wp-json\/wp\/v2\/comments?post=3341"}],"version-history":[{"count":7,"href":"https:\/\/gitco-int.com\/new\/wp-json\/wp\/v2\/pages\/3341\/revisions"}],"predecessor-version":[{"id":3370,"href":"https:\/\/gitco-int.com\/new\/wp-json\/wp\/v2\/pages\/3341\/revisions\/3370"}],"wp:attachment":[{"href":"https:\/\/gitco-int.com\/new\/wp-json\/wp\/v2\/media?parent=3341"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}